Garages

Large Structure Checklist

Large Structure Checklist

It’s the customer’s responsibility to check town requirements!

  • This is generally on average a 6-month process
  • Drawings, 1 month. Regular drawings take about 2-4 weeks and cost 500.00.   Sealed/stamped drawings cost 1000.00 and take 4-6 weeks
  • Township approval, 1-2 months. Once you have your drawings, please submit them to the town for Final approval.
  • Foundation, 1-2 months. We do not do the foundation but work with different companies based on your needs and location. Please ask for foundation contact information from your sales rep
  • Foundation is done, Build process 2-3 months. Once the foundation is done please contact us as we like to take final measurements to ensure a proper installation. Once the measurements are sent over, we should have a rough install date.
  • Please note, there is nothing we can do to expedite orders or drawings.
  • Drawings are a separate cost and an order for drawings needs to be in place to receive them.

Suggested Foundations

Check town requirements for foundation

Frost Protected Foundation

  • 8″ off of ground contact adding to the longevity
  • Most towns will require this foundation

Haunch Foundation

  • Simplest foundation to do
  • Some towns will allow this
Garage Door Options
Garage Door Styles
  • No Image
    Standard garage door
  • No Image
    Standard garage door w/ glass
Garage Trim Options
  • No Image
    Straight Trim
  • No Image
    45 Degree Trim
  • No Image
    Arched/Rounded Trim
Carriage/Homestead Garage Door Glass Inserts
  • No Image
  • No Image
  • No Image
    Carriage garage door w/ 8-Lite Arch Somerton insert
Santiago Garage Door Glass Inserts
  • No Image
  • No Image
  • No Image
    Santiago door w/ 10 Lite Arch Seine insert
  • No Image
    Santiago door w/ 10 Lite Madeira insert

Amish Mike & ISPW Wrestling Presents Kurt Angle at Hackettstown High School - 3/13/2026

The Neshanic Station Amish Mike location will be closed on Sunday 1/25 due to heavy winter weather. We plan on re-opening on Monday 1/26